4 Different Interpretations of the term ‘Fully Loaded Cost’

By
Anil Mudumbi
October 11, 2023
Share this post

What is Fully Loaded Cost?

‘Fully Loaded Cost’ could be interpreted in multiple ways. It depends on the role of an individual and the cost aspect they’re perceiving it from. There are the following 4 interpretations

Finance

All costs that make up a staff cost eg Property, HR, Legal costs. Such cost flow through the corporate waterfall.

IT Functional

The ‘Fully Loaded Cost’ of an IT Functional cost category such as datacentre, databases is made up of all the Staff, Contracts and aspects such as Depreciation.

IT Service

This is made up of Direct and Indirect costs to a Service such as 3rd party Contracts; Staff Timesheets; Infrastructure (eg Servers, Storage, Network); Operational (eg Incidents); and Other financial charges (eg Depreciation)

Business Unit

This constitutes all costs that make up a business unit such as Direct costs (eg Contracts & People) of dedicated systems; plus underpinning Infrastructure costs (eg Data Centre, Servers, Storage, Network) supporting these systems; and indirectly attributable costs (eg Service Mgmt, etc); plus Shared Platform costs (eg Messaging, CRM, etc); and Corporate & Desktop costs (eg Premises, Finance)

Request custom demo

If you would like to understand our product better select from one of the options

Somewhat unsure? arrange a quick clarification call
Understand solution - and would like to see the detail?
An initial call that covers a quick overview and understand your needs to determine if there is a solution fit
A full Product Demo tailored to your specific needs covering data aspects and business case
By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy for more information.